Work Order dt.20.09.2019 Supply, Installation, testing & Commissioning of 25 Nos.25 KVA DG sets for construction of 200 Nos. Two Bed Room Flats in Sec.51A, Chd. (Division-V)
Work Order dt.20.09.2019 Supply, Installation, testing & Commissioning of 25 Nos.25 KVA DG sets for construction of 200 Nos. Two Bed Room Flats in Sec.51A, Chd. (Division-V)